A PE main almost always ends somewhere metal. A transition fitting fuses to the plastic pipe at one end and takes a weld or a thread at the other, and the two decisions that matter are the steel end and the coating. All six families are below, with the carbon steel versus stainless comparison made honestly: we make carbon steel, stainless is to order.

6transition families
dn25–dn355size range
2steel end types
2coating options

What a steel-to-PE transition actually is

A transition fitting is two products joined into one: a PE end that fuses to the plastic pipe, and a steel end that takes a thread or a weld. It exists because a PE main almost always ends somewhere metal: a riser, a valve, a meter, a pump, a steel main in the next street.

We mould the PE end and fit the steel end, and the two variables you choose are the steel end (plain for welding, or threaded) and the coating (standard or 3PE). Length is fixed by the family: the bent versions come in two steel lengths, 1.1 m (a 0.3 m and a 0.8 m section) and 1.5 m (0.3 m and 1.2 m).

The six transition families
TypeSteel endShapeSteel lengthPE seriesSize range
StraightPlain (for welding)StraightStandardSDR 11dn25 – dn355
StraightPlain (for welding)StraightStandardSDR 17dn90 – dn355
BentPlain (for welding)90° bend1.1 m (0.3 + 0.8)SDR 11dn25 – dn63
Bent, threadedThreaded90° bend1.1 m (0.3 + 0.8)SDR 11dn25 – dn63
BentPlain (for welding)90° bend1.5 m (0.3 + 1.2)SDR 11dn25 – dn63
Bent, threadedThreaded90° bend1.5 m (0.3 + 1.2)SDR 11dn25 – dn63

Carbon steel or stainless: the decision

Carbon steel is the standard, and it is what all six families above are made in. Stainless is the answer to a specific problem, not a general upgrade, and it is worth being clear about which problem you have before you specify it.

Steel end material, side by side
 Carbon steelStainless steel
Availability in our rangeAll six families, both coatings, ex worksMade to order, quoted per project
Corrosion resistanceNeeds the coating to do the work; a damaged coating is the usual failureResists chlorides and aggressive soils without relying on a coating
Typical reason to choose itThe default for buried mains, risers and meter connectionsAggressive ground, coastal or saline environments, chemical or industrial water, exposed locations where coating repair will not happen
Joining the steel endWeld or thread, the same as any carbon steel pipeWeld or thread, but the welding procedure is different and dissimilar joints need the right consumable
CostLower, and the coating options are already in the priceHigher, and lead time is longer because it is not a stock item
Watch out forCoating damage in handling, and the cut end left bare on siteThreading stainless is slower and galling has to be managed
Be straight with your client about this. Every family on this page is carbon steel. Stainless ends are made to order and quoted per project, so if the specification calls for stainless, say so at enquiry rather than at order, and expect a longer lead time than the tables suggest.

Where the environment is aggressive but the budget will not take stainless, the usual compromise is a 3PE coating on a carbon steel end, with the coating extended over the weld zone after installation. That works if someone actually does the coating repair; it does not work if the joint is buried and forgotten.

Choosing the length: 1.1 m or 1.5 m

The bent families come in two steel lengths, and the difference is where the bend sits relative to the surface.

  • 1.1 m (0.3 + 0.8) – the shorter steel end. Less steel to bury, less to protect, and the bend is closer to the termination.
  • 1.5 m (0.3 + 1.2) – the longer steel end. Used where the transition has to reach further, for example where the PE has to stay below a deeper cover or where the riser has to clear an obstruction.

Both are SDR 11 and both run dn25 – dn63, with plain or threaded steel ends, so length is the only variable between them. The straight families are not split this way: they are supplied in one steel length per size.

Straight transitions

For a PE main that runs straight into a steel main, a valve or a chamber. Plain steel end, so the joint on the steel side is a weld. Two series: SDR 11 from dn25, SDR 17 from dn90.

Straight Steel-to-PE Transition, Plain Steel End, SDR 11dn25–dn355 · 36 sizes

36 combinations, dn25 to dn355, in standard coating and 3PE. Each size is listed against the steel DN it takes.

Straight Steel-to-PE Transition, Plain Steel End, SDR11 – dn25–dn355 · 36 sizes
SizeStandard Coating3PE CoatingSizeStandard Coating3PE Coating
dn25 / DN22✓✓dn75 / DN76✓✓
dn25 / DN27✓✓dn90 / DN76✓✓
dn32 / DN22✓✓dn90 / DN89✓✓
dn32 / DN27✓✓dn110 / DN89✓✓
dn32 / DN34✓✓dn110 / DN108✓✓
dn40 / DN27✓✓dn110 / DN114✓✓
dn40 / DN34✓✓dn125 / DN133✓✓
dn40 / DN38✓✓dn160 / DN159✓✓
dn40 / DN42✓✓dn160 / DN168✓✓
dn40 / DN48✓✓dn200 / DN219✓✓
dn50 / DN42✓✓dn225 / DN219✓✓
dn50 / DN48✓✓dn250 / DN219✓✓
dn63 / DN34✓✓dn250 / DN273✓✓
dn63 / DN38✓✓dn315 / DN273✓✓
dn63 / DN42✓✓dn315 / DN299✓✓
dn63 / DN48✓✓dn315 / DN325✓✓
dn63 / DN57✓✓dn355 / DN325✓✓
dn63 / DN60✓✓dn355 / DN377✓✓

Straight Steel-to-PE Transition, Plain Steel End, SDR 17dn90–dn355 · 17 sizes

17 combinations, dn90 to dn355. The higher-series straight transition, for SDR 17 mains.

Straight Steel-to-PE Transition, Plain Steel End, SDR17 – dn90–dn355 · 17 sizes
SizeStandard Coating3PE CoatingSizeStandard Coating3PE Coating
dn90 / DN76✓✓dn225 / DN219✓✓
dn90 / DN89✓✓dn250 / DN219✓✓
dn110 / DN89✓✓dn250 / DN273✓✓
dn110 / DN108✓✓dn315 / DN273✓✓
dn110 / DN114✓✓dn315 / DN299✓✓
dn125 / DN133✓✓dn315 / DN325✓✓
dn160 / DN159✓✓dn355 / DN325✓✓
dn160 / DN168✓✓dn355 / DN377✓✓
dn200 / DN219✓✓   

Bent transitions, 1.1 m steel end

The bent transition turns the line up out of the ground, from the PE main into a steel riser. Steel length 1.1 m, made of a 0.3 m and a 0.8 m section. Plain end for welding, or threaded for a screwed connection.

Bent Steel-to-PE Transition, Plain Steel End, 1.1 mdn25–dn63 · 16 sizes

16 combinations, dn25 to dn63. Read the first number as the PE size and the second as the steel size.

Bent Steel-to-PE Transition, Plain Steel End, Steel Length 1.1 m (0.3 + 0.8), SDR11 – dn25–dn63 · 16 sizes
SizeStandard Coating3PE CoatingSizeStandard Coating3PE Coating
dn25 × 22✓✓dn50 × 42✓✓
dn25 × 27✓✓dn50 × 48✓✓
dn32 × 22✓✓dn63 × 34✓✓
dn32 × 27✓✓dn63 × 38✓✓
dn32 × 34✓✓dn63 × 42✓✓
dn40 × 34✓✓dn63 × 48✓✓
dn40 × 42✓✓dn63 × 57✓✓
dn40 × 48✓✓dn63 × 60✓✓

Bent Threaded Steel-to-PE Transition, 1.1 mdn25–dn63 · 14 sizes

14 combinations, dn25 to dn63. Threaded steel end; state the thread standard with the order.

Bent Threaded Steel-to-PE Transition, Steel Length 1.1 m (0.3 + 0.8), SDR11 – dn25–dn63 · 14 sizes
SizeStandard Coating3PE Coating
dn25 × 22✓✓
dn25 × 27✓✓
dn32 × 22✓✓
dn32 × 27✓✓
dn32 × 34✓✓
dn40 × 34✓✓
dn40 × 42✓✓
dn40 × 48✓✓
dn50 × 42✓✓
dn50 × 48✓✓
dn63 × 34✓✓
dn63 × 42✓✓
dn63 × 48✓✓
dn63 × 60✓✓

Bent transitions, 1.5 m steel end

The same fitting with a longer steel end, 1.5 m made of a 0.3 m and a 1.2 m section. It is the one to use where the riser has further to go, or where the PE has to stay under a deeper cover.

Bent Steel-to-PE Transition, Plain Steel End, 1.5 mdn25–dn63 · 19 sizes

19 combinations, dn25 to dn63, the widest of the bent tables.

Bent Steel-to-PE Transition, Plain Steel End, Steel Length 1.5 m (0.3 + 1.2), SDR11 – dn25–dn63 · 19 sizes
SizeStandard Coating3PE CoatingSizeStandard Coating3PE Coating
dn25 × 22✓✓dn40 × 48✓✓
dn25 × 27✓✓dn50 × 42✓✓
dn32 × 22✓✓dn50 × 48✓✓
dn32 × 27✓✓dn63 × 34✓✓
dn32 × 32✓✓dn63 × 38✓✓
dn32 × 34✓✓dn63 × 42✓✓
dn40 × 32✓✓dn63 × 48✓✓
dn40 × 34✓✓dn63 × 57✓✓
dn40 × 38✓✓dn63 × 60✓✓
dn40 × 42✓✓   

Bent Threaded Steel-to-PE Transition, 1.5 mdn25–dn63 · 14 sizes

14 combinations, dn25 to dn63. Threaded steel end.

Bent Threaded Steel-to-PE Transition, Steel Length 1.5 m (0.3 + 1.2), SDR11 – dn25–dn63 · 14 sizes
SizeStandard Coating3PE Coating
dn25 × 22✓✓
dn25 × 27✓✓
dn32 × 22✓✓
dn32 × 27✓✓
dn32 × 34✓✓
dn40 × 34✓✓
dn40 × 42✓✓
dn40 × 48✓✓
dn50 × 42✓✓
dn50 × 48✓✓
dn63 × 34✓✓
dn63 × 42✓✓
dn63 × 48✓✓
dn63 × 60✓✓

How to specify a transition

  1. PE size and series: dn and SDR. Both straight families are split by series, so this decides the family.
  2. Steel size: every row lists the PE size against the steel DN it takes, and one PE size often takes two or three different steel sizes. Give the steel pipe size, not just the PE size.
  3. Steel end: plain for welding, or threaded. If threaded, give the standard.
  4. Shape and length: straight, or bent in 1.1 m or 1.5 m.
  5. Coating: standard or 3PE. Say if the coating has to be extended over the weld zone on site.
  6. Material: carbon steel is standard. Stainless is made to order and quoted separately.

Frequently asked questions

Can you supply the transition in stainless steel?

Yes, made to order and quoted per project. The six families on this page are carbon steel as standard, in standard coating or 3PE. If the specification calls for stainless, raise it at enquiry stage: the lead time is longer than the tables suggest because it is not a stock item.

What do the two numbers in the size mean, like dn63 × 42?

The first is the PE outside diameter, the second is the steel size. One PE size takes several steel sizes, which is why the tables list the combinations rather than a single range.

What is the difference between the 1.1 m and 1.5 m bent transitions?

The steel end length: 1.1 m is made of a 0.3 m and a 0.8 m section, 1.5 m of a 0.3 m and a 1.2 m section. The longer one is used where the riser has further to reach or the PE has to stay deeper.

Standard coating or 3PE?

Standard coating for normal buried service. 3PE where the ground is aggressive or the steel end is exposed, and where the coating will be inspected and repaired if damaged. Both are listed for every size in the tables.

Is the PE end electrofusion or butt fusion?

The straight and bent transitions in our range are butt fusion on the PE side, which is why every family is listed by SDR. Butt fusion is what gives the full-section joint at the PE end of a transition.