If you have any enquiry about quotation or cooperation, please feel free to email us at julie@zjqingfa.com or use the following enquiry form. Our sales representative will contact you within 24 hours. Thank you for your interest in our products.
Six lines that get you a price instead of a question
The form below collects a name and an address. A price needs six technical facts, and each one moves the number. Send all six and the reply is a size list with unit prices; send four and the reply is a question.
| What to state | Example | What changes if it is missing |
|---|---|---|
| Product family | Electrofusion coupling, butt fusion equal tee, PE ball valve | A different mould, a different price basis |
| Diameter and SDR | DN110, SDR11, PE100 | Wall thickness and weight are unknown, so is the price |
| Standard and marking | EN 12201, or EN 1555 for gas | Test package and marking change, and so does cost |
| Quantity per size | 200 pcs DN63, 80 pcs DN160 | Set-up cost per size is spread over an unknown batch |
| Delivery place and terms | FOB Ningbo, or CIF to a named port | Freight and packing cannot be quoted |
| Documents required | 3.1 certificate, test report, certificate of origin | Third-party inspection and paperwork are priced separately |

Why the quantity is quoted per size, not per order
Injection moulding carries a set-up cost on every run: the mould goes into the machine, the first parts are checked against the drawing, and production only starts once they pass. That cost is fixed per size, so a single order of 1,000 pieces spread across eight sizes is not the same job as 1,000 pieces of one size. It is the reason a size list is quoted line by line, and the reason a small quantity of an unusual diameter can cost more per piece than a large quantity of a common one.
The same logic explains why some sizes ship from stock and others from a production slot. Sizes that move regularly are held; a DN800 tee or a DN355 ball valve is usually made to order. If a project date is fixed, say so in the enquiry, and the reply will state which lines are available immediately and which need a production window.
What comes back
A quotation from Qingfa states, for each line: the product reference, the diameter and SDR, the material grade, the unit price, the packing quantity and the lead time. Above the table it names the standard the goods will be marked to and the documents that travel with them. If the enquiry asked for a certificate of origin or a third-party inspection, that is listed as a separate line rather than folded into the unit price, so the comparison with another supplier stays honest.
Where a specification is incomplete, the reply will name the assumption it used rather than leave it out. If the assumption is wrong, the correction is quick; if it is invisible, it surfaces at the port.
Before you send the form
Three pages on this site answer most of the questions that come in before a price: the HDPE fittings specification tables for every series by diameter and wall thickness, the application guide for the joint method each duty normally uses, and the installation guide for the site conditions that affect which fitting is ordered. The full series list is on the products page.
If what you need first is an indicative number rather than a quotation, both 2026 price lists are published in full: the gas fitting price list with 824 entries and the water supply price list with 785, all in RMB per piece. Read those figures as the starting point; what comes back from this form is the same list priced against your quantities, which is usually lower on the lines that carry the volume.
For certificates and test reports already issued, see the certificate page. For drawings and dimension tables you can download without asking, see download.