Projects
Qingfa PE and HDPE pipe fittings are installed in gas and water pipeline projects across China, Russia and Southeast Asia. Every project is supplied from the same certified range - DN20 to DN1600 butt fusion fittings, DN20 to DN1400 electrofusion fittings, PE ball valves DN40-DN355 and welding machines for DN20-DN630 pipe - manufactured under ISO, CE, KS and WRAS certifications. Contact our team for references, material certificates and installation records for your market.
Project in Xinjiang, China
Butt fusion and electrofusion fittings for gas and water pipelines - EN 1555 / ISO 4437, EN 12201 / ISO 4427
Project in Russia
HDPE butt fusion and electrofusion fittings for gas distribution - EN 1555 / ISO 4437, PE100
Project in Guangdong, China
Butt fusion and electrofusion fittings for gas and water pipelines - EN 1555 / ISO 4437, EN 12201 / ISO 4427
Project in Indonesia
Butt fusion and electrofusion fittings for water and industrial pipelines - EN 12201 / ISO 4427
What these projects have in common
Four references, two duties. Two are gas networks, two are water and industrial lines, and all four were supplied to the same pair of standards - EN 1555 and ISO 4437 for gas, EN 12201 and ISO 4427 for water. That is not a coincidence of geography. A project order that mixes standard systems inside one delivery is rejected at inspection, and the cost of that rejection is measured in weeks of a construction programme, not in the price of the goods.
| Reference | Duty | Standard | Scope supplied |
|---|---|---|---|
| Xinjiang, China | Gas and water mains | EN 1555 / ISO 4437, EN 12201 / ISO 4427 | Butt fusion and electrofusion fittings |
| Russia | Gas distribution, PE100 | EN 1555 / ISO 4437 | Butt fusion and electrofusion fittings |
| Guangdong, China | Gas and water mains | EN 1555 / ISO 4437, EN 12201 / ISO 4427 | Butt fusion and electrofusion fittings |
| Indonesia | Water and industrial | EN 12201 / ISO 4427 | Butt fusion and electrofusion fittings |
A project is supplied as a package, not as a product
Fittings alone do not make a line. A gas or water main needs the pipe, the fittings, the valves that isolate sections, the welding machine that joins them and the parameters the machine is set to. When the fittings and the machine come from different sources, the fusion parameters in the fitting data sheet and the settings on the machine are two different documents, and the first failed joint is discovered on site rather than in a procedure review.
Supplying the machine with the fittings closes that gap. It also means the electrode configuration, the fusion time and the cooling period come from the same test file as the product, which is the version an inspector will ask to see. Welding machines are supplied for pipe from DN20 to DN630, and the fittings in the same shipment cover the full programme: butt fusion from DN20 to DN1600, electrofusion from DN20 to DN1400, and PE ball valves from DN40 to DN355.
What a project order specifies that a stock order does not
| Item | Stock order | Project order |
|---|---|---|
| Standard | One, implied by the product | Named in the contract, and often two in parallel |
| Marking | Product marking only | Product marking plus project reference on carton and label |
| Documents | On request | Batch certificate, test report, packing list, issued as a set |
| Delivery | One shipment | Phased to the construction sequence, size by size |
| Support | Data sheets | Welding parameters, operator guidance, joint records format |

How a project order runs
The sequence is the same for a single container and for a multi-phase programme. What changes is the amount of documentation that has to be signed off in the first two steps.
Most project delays that are blamed on the factory happen before production starts: a size list that keeps changing, a drawing approved against a different revision, a standard that was assumed rather than written down. Freezing those three items is the single most useful thing a buyer can do, and it is why the first step in the sequence below is a signature rather than a purchase order.
Where to go next
Gas references are described in more detail on the HDPE gas fittings page, water and industrial references on HDPE water supply fittings, and the joint method each duty implies is set out in the application guide. The approvals behind the references are listed on the certificate page, and the documents that travel with a project shipment are described under download. To discuss a reference close to your own, use the contact page.