qingfa Factory View

 

Our company covers an area of 35,000 square meters, equipped with 42 advanced injection molding machines of various types, nearly 50 high-precision CNC processing equipment, over 10 sets of automated welding equipment, and has a central material supply system and multiple sets of automated production equipment. The annual production capacity of polyethylene pipe fittings reaches 10,000 tons.

What the plant actually does with those numbers

Thirty-five thousand square metres, 42 injection moulding machines, close to 50 machining centres and more than 10 automated welding stations. The figures are easy to quote and hard to interpret, so here is what they change for a buyer.

The point is not the size. It is that moulding, machining, welding and inspection all happen inside one site, on one material stream, under one quality file. A fitting that is moulded in one place, machined in a second and assembled in a third carries three sets of tolerances and three sets of records. When a batch fails, nobody can say which step did it.

Capacity, in the terms that matter to an order

Resource Figure What it means when you order
Site area 35,000 m2 Mould store, machining and finished goods under one roof
Injection moulding machines 42 Small couplings and large tees run on separate machines, in parallel
CNC machining centres Close to 50 Flange faces, valve seats and spigot ends machined, not moulded to tolerance
Automated welding stations More than 10 Electrofusion coils and valve bodies joined under repeatable settings
Material supply Central drying and conveying One resin stream to every machine, so a batch is one batch
Annual capacity 10,000 t of PE fittings A container programme fits inside normal scheduling, not beside it
Five production operations for HDPE pipe fittings: moulding, machining, welding, inspection and packing
Moulding, machining, welding and inspection inside one site means one set of tolerances and one set of records, not three.

Five operations a fitting passes through

Every item on the site follows the same route, and each step leaves a record that the next step can check against.

1. Moulding

PE100 compound is dried and conveyed to the machine, moulded, cooled under controlled conditions and ejected. The first parts of every run are measured against the drawing before the run continues; wall thickness, bore and socket depth are the three dimensions that decide whether the part can be welded at all.

2. Machining

Moulded blanks are faced, bored and finished on CNC centres. The surfaces that matter are the ones a seal or a heating plate touches: flange faces, valve seats, spigot ends. These are machined rather than moulded to tolerance because a moulded surface carries shrinkage, and a flange face that is not flat will not seal against a steel mating flange whatever torque is applied.

3. Assembly and welding

Electrofusion fittings receive their coil and terminal pins; valve bodies are joined to their end connections. The parameters here are the same ones a site welding machine uses, which is why the factory and the field speak the same language about a joint.

4. Inspection

Dimensional check against the drawing, visual check on the fusion zone, and pressure or leak testing on the assemblies that carry one. Samples are taken destructively at intervals: a fitting cut open shows whether the coil is where the drawing says it is and whether the wall around it is consolidated.

5. Packing and storage

Cartons are marked with size, batch and quantity. PE is degraded by ultraviolet light, so finished goods are stored indoors and shipped in packaging that keeps the sun off. A fitting that has sat in a yard for a season will still weld, but its surface will have aged, and the difference shows up in the fusion, not on the pallet.

What a visit can actually verify

A factory tour proves less than buyers hope and more than a brochure. What can be checked on site is the machine list against the machine hall, the material grade against the incoming inspection records, the calibration status of the measuring equipment, and the traceability chain from a carton label back to a moulding run. What cannot be checked in an afternoon is consistency across a year - that is what the batch records and the third-party test reports are for.

The approvals held by the plant, and the reports behind them, are listed on the certificate page. The department-by-department layout is on the workshop page, and the custom moulding work the plant takes on is described under injection moulding service. For size ranges and wall thickness, see the specification tables; to arrange a visit, use the contact page.