What Preparations Need To Be Made Before Welding The Electrically Fused Pipe Fittings?

Mar 13, 2026

Leave a message

What preparations need to be made before welding the electrically fused pipe fittings?

1. Pipe Material Processing

1. Pipe material processing: Completely scrape off the oxide layer on the surface of the pipe (remove a thickness of ≥ 0.5mm), ensuring there is no residual oxide film.
2. Clean the interface: Use a clean cloth to wipe the outer wall of the pipe and the inner wall of the pipe fitting, removing sand, oil, moisture and other impurities to avoid contaminating the molten interface.
3. Check the accessories: Confirm that the pipe fitting is undamaged and the resistance wire is not broken, and check that the model of the pipe fitting is consistent with the specification and pressure grade of the pipe material.
4. Equipment calibration: The electric fusion welding machine needs to be calibrated in advance to ensure stable output voltage (usually 39.5V) and current, and avoid using an excessively long extension cable which may cause a voltage drop.

Central Plastics Electrofusion Fittings

Need A Welding Machine You Can Rely On Site?

Zhejiang Qingfa Pipe Technology Co., Ltd. has manufactured PE pipe fittings since 1999, covering 65 product families from dn20 to dn1200 with ISO 9001, ISO 14001 and ISO 45001 certification, ECM approval and a CNAS-accredited in-house laboratory. Send us your specification and our team will come back with a quotation and the test documentation your project needs.

Zhejiang Qingfa Pipe Technology Co., Ltd. · www.qingfaindustry.com · +86 151 6813 1515

Send Inquiry