The Electro Fusion Joints are heat fused. The sequence below is the standard procedure for the Electro Fusion Joint HDPE; the welding machine manual takes precedence wherever the two differ.
Most joint failures trace back to preparation rather than to the fusion cycle, so the preparation steps carry as much weight as the timed ones.
| Size band | Wall series | Typical use |
|---|---|---|
| dn20 - dn110 | SDR11 and SDR17 | distribution mains and industrial lines |
| dn125 - dn250 | SDR11 and SDR17 | trunk mains and industrial lines |
| dn280 - dn630 | SDR11 and SDR17 | large bore and project supply |
Before you start
Prepare the pipe before the Electro Fusion Joint HDPE joint is opened: these are the checks that decide whether the fusion cycle will be worth running.
- Cut the pipe square and remove the burrs.
- Scrape the oxidation layer off the fusion zone over the full socket depth.
- Mark the insertion depth on the pipe with a marker.
- Keep the pipe ends and the units dry and clean.
- Check that the marking matches the pipe SDR.
The scrape is the step most often skipped when installing the Electro Fusion Joint HDPE. PE oxidises in daylight, and a joint fused through an oxide layer looks sound and still fails under sustained pressure.
Fusion procedure
- Clamp the pipe in the welding machine.
- Face both ends until they are parallel and clean.
- Match the fusion parameters to the dn size and the SDR.
- Bring the faces to temperature and hold the specified heating time.
- Remove the heater and bring the joint together inside the changeover time.
- Hold under pressure for the full cooling time before moving the pipe.
Changeover time is the window between removing the heater and the faces meeting. It is short by design, so everything needed for the next step of the Electro Fusion Joint HDPE joint should be within reach before the heater comes out.
Inspection after fusion
On a Electro Fusion Joint HDPE joint, check that the insertion marks are still visible at the socket edge and that the bead is continuous and even all the way round. A bead that is thin on one side means the faces were not parallel.
Common defects and causes
These are the failures that recur on electro fusion joint hdpe installations across the dn20 to dn630 range:
- Cold joint: heating time too short, or changeover time exceeded.
- Brittle bead: material overheated or contaminated.
- Offset joint: pipe not clamped square in the machine.
- Insufficient insertion: depth mark not checked before cooling.
- Contaminated fusion zone: scraping skipped or done with a dirty blade.
Specifications
Each row below is one product group held for this range - 3 groups in all, running dn20 to dn1400 between them - with the number of sizes tooled in each.
| Product group | dn range | Number of sizes |
|---|---|---|
| Electrofusion Straight Coupling | dn20–dn1400 | 32 |
| Electrofusion 90° Elbow | dn25–dn900 | 27 |
| Electrofusion Equal Tee | dn25–dn630 | 25 |
Ranges above are the ones held in production, not catalogue limits. Where a job needs a size outside a group, it is a new tool rather than a stock item, so it is worth confirming before the schedule is fixed.
The full size-by-size matrix for each of these groups is on the specification library.
Related pages
Other pages in the Electro Fusion Joint HDPE section, each covering a different angle of the same product family:
-
Electro Fusion Joint HDPE
The Electro Fusion Joint HDPE is a factory-moulded PE100 joint body with a built-in electrical heating coil, purpose-built for joining two high-density polyethylene pipes into one continuous,
-
Tee Electrofusion
An equal-bore electrofusion tee that branches a PE line while keeping the same internal size through all three outlets, so the flow divides evenly with low turbulence. The one-piece tee welds onto
-
Fitting Electrofusion
A dependable electrofusion fitting in tee form, pressure-rated and available across the nominal size range, welded in minutes with standard equipment. It brings the durability and simple installation
-
Union Electrofusion
An electrofusion tee that acts as a one-piece union, joining three pipe ends in a single moulding instead of the separate couplings an improvised branch would need. Because the three sockets arrive
-
Fusion Pipe And Fittings
An electrofusion tee supplied from the same system as the PE pipes and fittings it joins, so materials, dimensions and fusion parameters stay consistent across the whole installation. Matching the
-
Electrofusion Reducer
Products Description National standard grade HDPE electric fusion diverter | New material PE100, precision casting Selected high-density polyethylene (HDPE) new raw materials, manufactured with PE100
-
HDPE Electrofusion Fittings
Electrofusion fitting range offers a complete HDPE pipe fittings portfolio from DN20 to DN1600, engineered in PE100 with SDR11 and SDR17 series. Each fitting is precision-moulded in a single piece
-
Electrofusion Gas Fittings
Electrofusion Gas Fittings are made of high-quality HDPE raw materials, which are non-toxic and environmentally friendly. They have excellent chemical corrosion resistance, are suitable for various
-
Electrofusion HDPE Pipe Fittings
A precision-engineered electrofusion fitting range manufactured to controlled moulding tolerances and supplied with documented fusion parameters. Each PE100 fitting carries an integral resistance
-
Central Plastics Electrofusion Fittings
Central Plastics Electrofusion Fittings features an electrofusion straight coupler, a precision-moulded PE100 socket designed to join two HDPE pipe ends into one continuous, leak-free run. Available
-
HDPE Fusion Weld Fittings
HDPE Fusion Weld Fittings Electrofusion Reducer are core pipe fittings for connecting pipes of different nominal diameters. The selectable range of pipe diameters covers multiple specifications from
-
HDPE Tapping Saddle Electrofusion
The HDPE Tapping Saddle Electrofusion is a saddle-type branch fitting that lets you add a tapped service line onto an existing PE main without cutting the pipe or stopping flow. Electrowelded into