A gas fitting is not a water fitting with a different label on the box. The body may come off the same mould, the resin is the same PE100 and the spigot dimensions are the same table, yet the product that reaches site is specified, tested and marked under a different family of standards, with a design coefficient that halves the allowable stress. This page sets out what ISO 4437 and EN 1555 ask of a PE100 gas fitting, which edition of each part is current, and where our own gas range stops.

5 partsper system standard
C ≥ 2.0design coefficient for gas
dn20–dn400electrofusion gas range
SDR 11/17both gas series

Five parts, and only one of them governs the fitting

Both families are written as system standards, split by product type rather than by type of requirement. That is why a supplier can say "we are ISO 4437" and still be impossible to check: the sentence carries no part number, and the part number is what tells a reviewer whether the document covers a fitting at all.

The system standards are split by product type. Only one part covers a fitting, and only one covers the joint
PartTitleWhat it governsChecked when you buy a fitting
1GeneralCompounds, MRS and the design coefficient, colour, fusion compatibility, marking of the systemYes – the arithmetic and the resin
2PipesPipe dimensions, tolerances, mechanical and physical propertiesOnly to confirm the pipe the fitting fuses to
3FittingsEF sockets and saddles, spigot fittings for butt and socket fusion, mechanical fittingsThis is the product standard
4ValvesValves for the same operating pressureWhen valves are in the package
5Fitness for purposeAssemblies and joints, plus the test parameters used by the parts aboveYes – the weld, not the body
CEN/TS 1555-7Assessment of conformityThe scheme a certification body audits a factory againstWhen you ask whether a maker is certified

Two entries in that table catch people out. The first is Part 5. The joint is not qualified in Part 3. Part 3 fixes the fitting; Part 5 fixes the assembly and the test parameters that go with it. A fitting that passes its own type tests tells you nothing about the weld until the weld is tested as an assembly – which is why an order that names only Part 3 has left the most failure-prone element out of the paperwork.

The second is CEN/TS 1555-7. It is a technical specification for the assessment of conformity, not a product standard, and it is the document a certification body works to when it audits a factory. So when a buyer asks "are you certified", the useful answer names the scheme, because the scheme is not in the product standard either.

ISO and CEN run the architecture in parallel: ISO/TC 138/SC 4 writes the gas system standards, CEN/TC 155 the European editions, and CEN/TC 234 sits on top with the installation rules, EN 12007-2 for PE pipelines up to 10 bar MOP. National practice then adds its own layer – in Germany DVGW G 472 covers installation of plastic gas pipework up to 16 bar – and none of these documents covers the fusion equipment, which is ISO 12176-1 for butt fusion and ISO 12176-2 for electrofusion.

Which edition you are actually being quoted against

This is the part of a standards page that goes stale fastest and matters most, because every gas document in both families has been revised within the last two years. Checked against the ISO and CEN catalogue entries in November 2026:

Edition status, checked against the ISO and CEN catalogue entries in November 2026
StandardCurrent editionNote
ISO 4437-12026General. Replaces the 2024 text, which had replaced the 2014 text; both are withdrawn. CHF 135 at ISO.
ISO 4437-22026Pipes. Same revision sequence. CHF 135.
ISO 4437-32026Fittings, the product standard. Same revision sequence. CHF 159.
ISO 4437-42022Valves, written in TC 138/SC 7 rather than SC 4. A revision is in progress.
ISO 4437-52024Fitness for purpose. Replaced the 2014 text.
EN 1555-12025General. Supersedes EN 1555-1:2021; national bodies had to publish the identical text by April 2026.
EN 1555-22025Pipes, revised in the same round as Part 1.
EN 1555-32025Fittings, the product standard, revised in the same round.
EN 1555-42025Valves, revised in the same round.
EN 1555-52021Fitness for purpose. Did not move with the 2025 revision.
CEN/TS 1555-7currentAssessment of conformity. Guidance for certification, not a product standard.

Read the ISO column carefully. The 2014 editions that most factory certificates and most online "ISO 4437" summaries still quote are withdrawn – and so are the 2024 editions that replaced them. The current gas parts are the 2026 text. At ISO the three product parts are CHF 135, CHF 135 and CHF 159, which is why a buyer rarely has the document open and a supplier rarely has it at all. That gap is exactly where a claim stops being falsifiable.

On the European side Parts 1 to 4 were revised in 2025, and the foreword of EN 1555-1:2025 requires national bodies to publish the identical text, and withdraw conflicting national standards, by April 2026. A German, French or Dutch national edition dated 2026 is therefore the same document with a national cover page. Part 5 did not move with the rest and stays at 2021.

The EN 1555-1:2025 change list is worth knowing, because it names the items a 2019 report cannot have covered:

  • terms and definitions redistributed across Parts 1, 2 and 3;
  • a conversion and normalisation step added to the CRB requirement, so ring-stiffness figures from different laboratories are comparable;
  • EN ISO 1183-3 accepted as an alternative method for compound density;
  • recommended stress ranges for the CRB and stress levels for the AFNCT added;
  • the strip bend test (ISO 21751) and the crush test (ISO 13955) accepted as alternatives to the ISO 13954 peel test;
  • an electrofusion compatibility requirement added;
  • an annex on the suitability of PE systems for 100 % hydrogen and its admixtures with natural gas.

That last annex is informative. It does not turn a natural-gas fitting into a hydrogen fitting and no supplier should present it as one: hydrogen service is a system design decision taken above the product standard, and it turns on permeation, on the operator's rules and on the resin, not on a compliance mark.

The design coefficient, and why the same body is two products

Nothing about the shape changes between a water fitting and a gas fitting at the same dn and SDR. What changes is the figure the wall is divided by. Both families derive the pressure class from the material's minimum required strength through a design coefficient:

PN = 20 × MRS ÷ ( C × (SDR − 1) )
PE100, MRS = 10.0 MPa (ISO 12162) → 200 ÷ ( C × (SDR − 1) )
Water, C = 1.25 → PN = 160 ÷ (SDR − 1)
Gas, C = 2.0 → PN = 100 ÷ (SDR − 1)

The gas coefficient is not a margin someone chose for comfort. It is a floor in the system standard, and a national gas code may sit above it, which is why the last column of the table below is there: at C = 2.5 the same SDR 11 pipe is an 8 bar product, not a 10 bar one.

The same wall, two classes. Water at C = 1.25, gas at C = 2.0, and the last column shows what a national code that raises the coefficient to 2.5 does to the same pipe
SDRPN, waterPN, gas at C 2.0Gas at C 2.5Gas service it suits
SDR 414.02.52.0Renovation liners, very low pressure
SDR 335.03.12.5Low-pressure distribution
SDR 266.44.03.2Low-pressure networks
SDR 218.05.04.0Medium-pressure distribution
SDR 17.69.66.04.8Distribution, where the operator specifies it
SDR 1710.06.35.0The second gas series, and the one most networks run
SDR 13.612.77.96.3Higher-pressure distribution
SDR 1116.010.08.0The workhorse: MOP 10 bar networks
SDR 920.012.510.0Above the EN 1555 ceiling; industrial gas
SDR 7.425.015.612.5Specialist high pressure

The gas column is exactly 62.5 %% of the water column at every SDR, because 100 ÷ 160 = 0.625. SDR 11 reads PN 16 in water and PN 10 in gas and is the same fitting both times.

Two cautions. PN is not MOP. The class is a property of the product at 20 °C; the maximum operating pressure is set by the network operator, and EN 1555 as a system stops at 10 bar MOP, which is why the SDR 11 line is the workhorse and SDR 9 is barely specified for gas at all. And the ratio does not license substitution in either direction: putting a water-class SDR 11 fitting into a gas line is not a 6 bar mistake, it is an unrated component, because that fitting was never type-tested in a gas assembly.

Temperature behaves the same way for both. EN 1555 covers an operating range of −20 °C to +40 °C against a 20 °C reference, and above that reference the allowable pressure derates. A line that runs warm needs the derated figure, not the table.

What Part 3 asks of the fitting

A pipe is a homogeneous wall in tension. A fitting is a moulded shape with a weld line, a stress concentration at every change of section, and – for electrofusion – a heating coil embedded in the socket wall and a fit that depends on the pipe's ovality. That is why fittings get their own part, and why the type tests are not the pipe's tests at different dimensions.

Part 3 in one table: what is asked, what it protects, and the method that proves it
RequirementWhat it protects in serviceHow it is checked
Compound grade and identityThat the pressure class arithmetic is valid at allDensity to ISO 1183, MFR to ISO 1133, MRS classification to ISO 9080 and ISO 12162
Oxidation induction timeThat the antioxidant survived the moulding cycleDSC, OIT to ISO 11357-6, on the pellets and on the finished part
Carbon black content and dispersionUV and weathering between factory and trenchISO 6964 for content, ISO 18553 for dispersion
Body wall thicknessThat the body is not the weak point of the assemblyMeasured to the dimensional tables; EF fittings to ISO 8085-3 are deemed to satisfy this
Socket and spigot dimensions, ovalityFusion pressure, alignment and insertion depthGauges against the tables in Part 3
Internal pressure of the assemblyThe 50-year pressure life of the jointISO 1167, water in water, at 20 °C and at 80 °C
Decohesion of the EF jointThe weld, where service failures concentrateISO 13954 peel; since 2025 also strip bend ISO 21751 or crush ISO 13955
Slow crack growthDamage from handling, backfill and trench point loadsISO 13479 notched pipe test
Rapid crack propagationArrest of a running crack at large diameterISO 13477, the S4 test
Fusion compatibilityTwo resin sources meeting in one networkCompatibility requirement carried by Part 1

Three rows in that table carry most of the risk.

Compound identity. A PE100 claim is a claim about 50-year hydrostatic strength, not about a resin brand. Density, melt flow rate and oxidation induction time together show whether the compound is what the certificate says and whether its antioxidant package survived the moulding cycle – a fitting cooked too long in the barrel is chemically a different product in the same shape. This is the check that a certificate cannot fake, because the numbers come from the pellets and from the finished part, and they have to agree.

Hydrostatic strength of the assembly. Tested on fitting plus pipe, at 20 °C and at 80 °C, to ISO 1167. The 80 °C point is the one that predicts slow crack behaviour, and it is the one most often absent from a report that shows a short 20 °C pass and stops.

Decohesion of the electrofusion joint. To ISO 13954 in the peel form, or, since the 2025 revision, by strip bend (ISO 21751) or crush (ISO 13955). Note what is being measured: not whether the body is strong, but whether the weld reaches cohesive failure in the polyethylene instead of peeling off the socket wall. A joint that fails at the interface has welded the wire to the pipe, not the pipe to the fitting.

One clause worth keeping in your pocket when a specification argument starts: electrofusion fittings conforming to ISO 8085-3 are deemed to satisfy the wall thickness requirement for the fitting body in EN 1555-3. A supplier holding that older standard is not out of compliance on body wall, and a buyer rejecting a lot on that ground alone is arguing with the wrong document.

What has to be on the body, and on the paper

Marking is the least glamorous clause in any standard and the one that decides whether a container clears goods-in. An unmarked fitting cannot be traced to a batch, a batch cannot be traced to a test report, and the certificate on file then becomes evidence of something that may not be in the box.

What the body carries, and what the paper has to match it with
ItemOn the fittingOn the certificate
MaterialPE100PE100, with the MRS class
Sizedn and SDRThe full size list the report covers
StandardNumber and partNumber, part and edition year
MakerManufacturer markFactory name and address
BatchBatch or date codeThe same code, linked to the test report
EF dataFusion parameters, printed or read through the terminal pinsThe validated cycle range
Independent test–Laboratory, report number, date

For electrofusion the requirement does double duty, because the fitting also has to carry the fusion data the control unit reads – through the terminal pins on current equipment, through a printed label on older units. If that data is missing the joint cannot be made to a validated cycle, and the assembly falls outside the fitness-for-purpose case in Part 5 no matter how good the body is.

What we put on ours is the material designation, the nominal size and SDR, the standard and part, our mark and a batch code that resolves to a date and a machine. The certificate that travels with the shipment names that same batch and the reports behind it.

Checking a supplier's claim in ten minutes

The point is not to catch anyone out. It is that a claim your engineer cannot check is worth nothing, and a claim that takes ten minutes to check is worth a great deal to procurement. Ask for six things:

  1. The standard with the part number and the edition year, on the certificate rather than on the website.
  2. The type test report, naming the laboratory and the date, with hydrostatic tests at both 20 °C and 80 °C.
  3. The wall series and size list the report covers. A report on dn110 says nothing about dn315.
  4. The scope statement: which product types, which jointing methods, which dn range, which SDR.
  5. The batch link from the marking on the fitting to the report.
  6. The edition gap analysis, if the report predates the current text.

Four things are worth treating as a stop sign:

  • "ISO 4437 certified" with no part number anywhere in the sentence.
  • A report dated before the current edition with no statement of what has changed since.
  • A size list that runs beyond the moulds the factory actually has. Ask for the mould list, not the catalogue.
  • Gas and water on the same certificate line, with the same pressure class for both.

Where our gas series stops

Our gas mould set is smaller than the water set, and the difference is worth stating before an enquiry rather than after it: water butt fusion fittings run to dn1600 and water electrofusion to dn1400, while the gas series is capped at dn400 for electrofusion and dn630 for butt fusion.

Our gas mould set, taken from the current size lists rather than from a catalogue range
Groupdn rangeSDR series
Electrofusion couplingsdn20–dn40011, 17
Electrofusion equal and reducing teesdn25–dn40011, 17
Electrofusion 45° and 90° elbowsdn25–dn40011, 17
Electrofusion reducing couplingsdn32–dn40011, 17
Electrofusion saddles, clamp and bypassdn63–dn40011
Electrofusion flange adaptordn110–dn40011
Butt fusion equal and reducing teesdn50–dn63011, 17
Butt fusion elbows and reducersdn75–dn40011, 17
Butt fusion stub enddn40–dn63011, 17
Ball valves, standard and with booster32–355 mm OD, eleven sizes11

That ceiling is a mould limit, not a standard limit. EN 1555 and ISO 4437 do not stop at dn400; the reason the gas range does is that distribution networks above dn400 are usually steel, and the volumes do not justify the tooling for a PE fitting at that size. If a project needs a dn500 gas tee, the honest answer is a longer lead time and a fabricated assembly, not a catalogue entry.

The valves follow the same logic in their own numbering: 32 to 355 mm outside diameter in eleven sizes, standard and with a booster port. Note the notation – the valve list is quoted by outside diameter rather than by dn, so quote it the way the list does and the two will not drift apart in an exchange.

The Chinese equivalent, and why it keeps appearing in tenders

Chinese gas systems are specified to GB/T 15558 in three parts: Part 1 for pipes, Part 2 for fittings, Part 3 for valves. Water systems use GB/T 13663 in the same three-part shape. The structure deliberately mirrors ISO 4437 and ISO 4427 – same idea, national text – which is why a GB report and an ISO report look familiar side by side, and why the two are still not interchangeable.

In practice a tender names one family and a Chinese quotation arrives with the other, and the buyer's engineer has to decide equivalence. Our position is the one that survives an audit: we test to the standard the order names, and the certificate says which one it is. If the order names EN 1555-3:2025, the report cites EN 1555-3:2025; if it names GB/T 15558.2, the report cites that. A document that quietly swaps one for the other is the thing to look for – not the difference between them.

What to put on the enquiry

Seven lines turn a question into a quotation without a round of emails:

  1. Size and wall series – dn and SDR, or dn and the pressure class if the SDR is not fixed yet.
  2. Standard, part and edition – for example EN 1555-3:2025.
  3. Fitting type and jointing – electrofusion or butt fusion, and for a tee or a reducer, which size is the run.
  4. Quantity by size, not a total tonnage.
  5. Marking requirement – whether the operator's own marking has to be moulded or printed on the body.
  6. Documentation set – certificate, type test reports, and whether third-party inspection is required.
  7. Destination port, because packing changes with the route and the container fill is quoted against it.

If the SDR is still open, tell us the network pressure and we will work the class back from the coefficient instead of quoting three options.

Frequently asked questions

Is ISO 4437 the same as EN 1555?

Same architecture, different documents. ISO/TC 138/SC 4 writes the ISO parts and CEN/TC 155 writes the European ones, the requirements converge, but the editions do not move together – the ISO gas parts are 2026 and EN 1555-1 to -4 are 2025. A report to one is strong supporting evidence for the other, yet the certificate should name the standard the order names.

Which part covers a fitting, rather than a pipe?

Part 3. Part 1 carries the compounds and the design coefficient, Part 2 the pipe, Part 5 the assembly and the test parameters. That Part 5 split is why the joint can pass or fail independently of the fitting.

Why is a gas fitting thicker than a water fitting at the same pressure?

It is not. At the same SDR the wall is the same and, on our side, so is the fitting. What changes is the class: the design coefficient doubles from 1.25 to 2.0, so SDR 11 reads PN 16 in water and PN 10 in gas. If a gas fitting genuinely is thicker for the same pressure it is because the SDR is lower, not because the wall at that SDR grew.

Can an ISO 4437 certificate be used for an EN 1555 order?

Only after a scope and edition check. Ask for the part number, the edition year and the size list, and have your engineer record the equivalence. A supplier should not be the party asserting equivalence, and a buyer who accepts it unexamined owns the consequence.

Do you make SDR 17 gas fittings as well as SDR 11?

Yes, both series across the gas range, and the SDR 17 list is shorter at the small end: on a coupling the range opens to SDR 17 from dn160 upward while the small sizes stay SDR 11 only. Where a project needs SDR 17 in a small size, ask before the order is placed rather than after.

What is the current edition of the gas standard?

ISO 4437-1, -2 and -3 are 2026, ISO 4437-4 is 2022 and ISO 4437-5 is 2024. EN 1555-1 to -4 are 2025 and EN 1555-5 is 2021. National editions of the European parts had to be in place by April 2026.

Is the fusion machine covered by the fitting standard?

No. ISO 12176-1 covers butt fusion equipment and ISO 12176-2 electrofusion equipment, and the joint itself is qualified as an assembly under Part 5. A fitting certificate and a machine certificate are two separate pieces of paper, and a job needs both.